Summer time is upon us and you know what that means; construction projects. Summer is the time when we work on the Babbidge Library bringing back to “pristine” condition. I know that’s a stretch considering the Homer Babbidge is 35 years old. But this summer we are doing something special. We are replacing much of the flooring in the library.

The first thing you may notice is that we are replacing the brown tile floors in the upper bathrooms. Currently, they are working on the level 4 Men’s and Women’s restrooms and they will soon be dropping down to levels 3, 2, 1 and eventually level B. That is the banging that you hear in the building as the chisel and jackhammer the old tile off the floor.

Leave a Reply

Your email address will not be published.